Remodeling & Renovation

Remodeling, under one roof.

On a typical remodel the painter is the last trade in, and paints over whatever the trades before left behind. We remodel kitchens, bathrooms, interior conversions and finish carpentry in existing homes, and we do the painting too. We hold B-2 and C-33 licenses, so one contractor answers for all of it.

An open-plan white kitchen with a long marble island, pendant lights and a living area beyond

02Licensing

One contractor, one point of contact.

Our B-2 Residential Remodeling classification covers multi-trade improvements to existing homes (kitchens, baths, conversions, finish carpentry), with structural and MEP systems work by appropriately licensed contractors. Holding it alongside our C-33 means one accountable party from start through final finish coat.

A built-in glass-front cabinet at the end of a hallway, with paneled trim and a stair railing
Licensed
B-2
Painting
C-33
CSLB
#803672

03What’s Included

What we remodel.

Three kinds of work under one license number.

  • A white kitchen with shaker cabinets, a farmhouse sink under the window and under-cabinet lighting

    Kitchens

    New layouts, cabinets and countertops. Licensed subcontractors do the plumbing and electrical, and we do the painting ourselves.

  • A walnut slab-front vanity island with a white top and two vessel basins, a freestanding tub and floor-length taupe curtains behind

    Bathrooms

    Main and guest bathrooms. We coordinate the trades and do the tile, the vanities and the finish carpentry.

  • An arched white built-in with fluted pilasters and shelves

    Finish Carpentry

    Built-ins, crown molding, wainscoting and trim restoration. A painter sees every open joint in a run of trim, which is why we care how it’s built.

04How a Remodel Fits Together

One plan, every trade.

A generic kitchen and bath reconfiguration, drawn to show where each part of the work lands. Choose a number to light it up.

A generic floor plan of a kitchen, dining room, hall and bath. Numbered callouts mark four areas of work: 01 the kitchen layout with the island moved, 02 a widened opening between kitchen and dining, 03 the bath fixtures grouped on one plumbing wall, 04 built-ins along the dining room walls. Kitchen Dining Hall Bath 01 02 03 04

Illustrative plan, not to scale

  1. The island moves to open up the work area. Cabinets and countertops are reset, and licensed subcontractors move the plumbing and electrical.

  2. A wider opening in a non-bearing partition joins kitchen and dining, framed and drywalled to take a Level 5 finish.

  3. The vanity, toilet and shower share one plumbing wall, which keeps the pipe runs short. Licensed subcontractors do the plumbing, and we run the tile and vanity as one job.

  4. A built-in along the dining wall and a window seat, with new crown and trim.

05Why McDermaid

What changes when the painter runs the job.

  1. One license for the remodel and the paint

    B-2 and C-33 together put the painting under the same license as the remodel. We plan the finish from the first day.

  2. Built to be painted

    Framing, drywall and the joints where one trade meets another are built to take a Level 5 finish. Patching them at the end costs more and shows.

  3. Larger homes, run quietly

    A status report with photos every week, a project portal you can check, and a schedule that works around yours. On private properties, discretion is part of the job.

06How We Work

Four phases, start to finish.

A large room opened to its wood framing and ceiling joists mid-remodel, the subfloor marked up
  1. Design Consultation

    We walk the house with you and talk through the scope. If you need a designer we’ll refer one, and you get a written proposal that shows the permit path.

  2. Permitting

    Drawings, with engineering referrals where the city requires them. We submit to the city and answer plan check.

  3. Construction

    Demolition, non-structural framing, drywall and finish carpentry, with licensed partners on the mechanical, electrical and plumbing rough-in. You get a status report with photos every week.

  4. Finish

    Cabinets go in, the walls get paint over a Level 5 finish, and the fixtures go up. Then we walk the house with you and work through the punch list.

Start with a walk-through.

We’ll listen to what you want, tell you what scope makes sense and put the price in writing.

White shaker cabinet drawers with brushed metal pulls
M
McDermaid Assistant
Automated assistant
McDermaid · (650) 961-7415