General Remodeling

The paperwork side of a remodel

Every Peninsula city runs its building department its own way, and a permit stuck in plan check holds up everything behind it. We manage the permits and the schedule for Bay Area Peninsula homeowners, from the first drawings to the final inspection.

Two hands holding a floor plan drawing flat on a patterned rug

01Single-Point Accountability

Somebody has to keep track of it all

A remodel can have a designer, an engineer, an inspector and several trades on it. We keep them in order, check the work as it goes, watch the budget and keep the records.

Two hands holding a spirit level against an open wall of wood studs and wiring

02Local Rules

Every city does it differently

Each city has its own review times, forms and rules. In 34 years as contractors in California, we’ve learned how they work, whether it’s a Menlo Park building permit, Atherton’s building permit requirements or a Los Altos remodeling permit.

Did You Know?

Atherton is one of the most permit-intensive towns on the Peninsula for residential remodeling. Beyond the building permit, the Town wants its own business license for the primary contractor and a list of subcontractors before final inspection. Often it also wants a landscape screening plan and Menlo Park Fire Protection District sign-off before a project can close. That’s three or four separate approvals. Homeowners running a renovation themselves tend to lose time between them, and a contractor who knows each office can save weeks.

03Peninsula Building Departments

Permit times, city by city

Typical times for a residential remodel. Actual times vary with the project and with how busy the department is.

City permit timeline comparison
CityOver-the-CounterPlan CheckNotes
Palo Alto 1 to 3 days 4 to 8 weeks Online portal available
Menlo Park 1 to 2 days 3 to 6 weeks Fire district coordination required
Atherton 2 to 5 days 6 to 10 weeks Business license and fire sign-off
Los Altos 1 to 3 days 4 to 7 weeks Historic review for older homes
Los Altos Hills 2 to 4 days 5 to 8 weeks County fire requirements
Woodside 2 to 4 days 5 to 9 weeks Heritage tree considerations
Portola Valley 2 to 5 days 6 to 10 weeks WUI zone requirements
Los Gatos 1 to 3 days 4 to 7 weeks Historic district considerations
Saratoga 2 to 4 days 5 to 8 weeks Hillside development standards

Quick Facts

Cities Served
Palo Alto, Menlo Park, Atherton, Los Altos, Los Altos Hills, Woodside, Portola Valley, Los Gatos, Saratoga
Documentation
Written scopes, RFIs, change orders and a running budget
Coordination
Architects, engineers, inspectors, specialty trades
Updates
A status report with photos every week
Accountability
One company answers for the job, start to finish

Starting a project?

Book a consultation, and bring your drawings if you have them.

Schedule Consultation (650) 961-7415

04Budget & Records

You’ll know where the money is

Scopes, change orders and budget updates stay in writing for the whole job. You can see what’s been done, what it cost and what’s been decided as it happens.

The trades

We schedule and check the work of the licensed electricians, plumbers and HVAC contractors, and the finish trades. Each one comes in when the work before theirs is done.

Two floor plan sheets, a set of keys, a spirit level and a white hard hat on a sunlit concrete floor

05Our Process

How we run a job

Two hands over a printed application form on a white desk, one holding a pen

Step 1 of 4: Scope & Permits

  1. We write the scope, file for the permits and work with the building department.

  2. We pick the specialty trades, schedule them and check their work.

  3. Weekly updates, inspections booked ahead, and problems dealt with when they come up.

  4. The final inspections, the punch list, and closing out the job.

Have plans, or just an idea?

Book a consultation and we’ll talk through the permits and the schedule.

A two-story house wrapped in scaffolding under a clear blue sky
M
McDermaid Assistant
Automated assistant
McDermaid · (650) 961-7415